Projects
Our main projects

In the field of electric power generation
Supply and erection of tools & equipment for the following projects:
- Oyoun Moussa Power Generation Plant ($ 30K)
- Al Kurayemat Power Generation Plant ($ 1000K)
- AL Sokhna Power Generation Plant ($ 900K)
- Nubareya 1, 2 Power Generation Plant ($ 50K)
- Sidi Krir Power Generation Plant ($ 30K)
- Talkha Power Generation Plant ($ 130K)
- ElTebeen Power Generation Plant ($ 80K)
- North Giza Power Generation Plant($ 600K)
- North Cairo Power Generation Plant ($120K)
- Al Shabab Power Generation Plant ($ 600K)
- West Damietta Power Generation Plant ($ 650K)
- Assiut Power Generation Plant ($ 600K)
- Benha Power Generation Plant ($ 1000K)
-
Oyoun Moussa Power Generation Plant
($ 30K) -
Al Kurayemat Power Generation Plant
($ 1000K) -
Ain Sokhna Power Generation Plant
($ 900K) -
Nubareya 1, 2 Power Generation Plant
($ 50K) -
Sidi Krir Power Generation Plant
($ 30K) -
Talkha Power Generation Plant
($ 130K) -
ElTebeen Power Generation Plant
($ 80K) -
North Giza Power Generation Plant
($ 600K) -
North Cairo Power Generation Plant
($120K) -
Al Shabab Power Generation Plant
($ 600K) -
West Damietta Power Generation Plant
($ 650K) -
Assiut Power Generation Plant
($ 600K) -
Benha Power Generation Plant
($ 1000K)

In the field of training laboratories and simulators
- Supply and Erection of 11 training Labs from A Tech to the vehicle department amounted ( $ 2000 K)
- Those LABs make a full simulation for Vehicles faults and support students to have a full practical course on Vehicles parts such as mechanical parts and electrical parts Those labs considered as the highest advanced technology labs in mechatronics in Egypt .
- A Tech Training presents a hands on approach to teaching and learning the skills of diagnosing and repairing automotive.
- A Tech become a world leader in the design and development of world class trainers and courseware for automotive OEM.
- Supply and Erection of 11 training Labs from A Tech to the vehicle department amounted ( $ 2000 K)
- Those LABs make a full simulation for Vehicles faults and support students to have a full practical course on Vehicles parts such as mechanical parts and electrical parts Those labs considered as the highest advanced technology labs in mechatronics in Egypt .
- A Tech Training presents a hands on approach to teaching and learning the skills of diagnosing and repairing automotive.
- A Tech become a world leader in the design and development of world class trainers and course ware for automotive OEM.

Zohr gas field in egypt
- Delivery of the tool package for the workshop of Zohr Gas field which is the largest offshore gas discovery in Egypt and the Mediterranean Offshore, The Package of tools was amounted about 200,000$

The contracting works for a complete floor
- Head Office of the IT WORX at the Nasr City Freezone, including the delivery and set up of the electromechanical works, architectural and finishing work ( L.E.1000K)

Design supply and erection of a fire fighting system using
- the Aqua mist technique for the board of ministers building in Cairo.
- This Project was executed with the cooperation of “Aqua Mist” England. ( L.E. 1200K)
- The General Secretariat of the Egyptian Council of Ministers assigned the fire risk insurance process to its various departments in its main building by using the Aqua mist firefighting system to UTECO due to the multiple advantages that this system is unique to the above mentioned on its counterparts of fire risk control systems. The implementation was carried out by UTECO company with great success the total area 6000 m2
- the Aqua mist technique for the board of ministers building in Cairo.
-
This Project was executed with the cooperation of “Aqua Mist” England.
(L.E. 1200K) - The General Secretariat of the Egyptian Council of Ministers assigned the fire risk insurance process to its various departments in its main building by using the Aqua mist firefighting system to UTECO due to the multiple advantages that this system is unique to the above mentioned on its counterparts of fire risk control systems. The implementation was carried out by UTECO with great success the total area of 6000 m2